Segmental Bridges
OPAC's work on segmental bridges included design, design review, construction review, construction engineering, engineering investigation and collapse investigation. Our principals have contributed in some of the earliest segmental bridge designs in the United States. Use the Personnel menus above to browse their individual segmental bridge portfolios.
OPAC Segmental Bridges (8 Total, 5 on this page)
I-4/Selmon Expressway Connector - Independent Design Check
Peer review and independent design check of a multiple levels freeway interchange built by segmental method.
Tampa, Florida. Construction completed 2014
Hoover Dam Bypass: Colorado River Bridge - Construction Engineering
Construction engineering for a 1,090 ft concrete arch bridge downstream of the Hoover Dam.
Nevada-Arizona. Construction completion 2010
Memorial Causeway Bridge - Engineering Investigation
Engineering investigation of a segmental bridge that consists of a nine-span 2,340 ft long concrete girder.
Clearwater, Florida. Investigation completed 2009
Ringling Causeway Bridge - Engineering Investigation
Engineering investigation of a segmental bridge having structural issues during construction.
Sarasota, Florida. Investigation completed 2009
Benicia-Martinez Bridge Pre-Bid Services - Construction Engineering
Pre-bid construction engineering services for a high-level, 17-span cast-in-place segmental bridge across the Sacramento River at the east entrace to the Carquinez Strait.
Benicia - Martinez, California. Construction completed 2007